PROJECTS
Ongoing projects
Period
Title
Funding
Role
2022.7.1 ~2027.6.30
“Intelligent development of semiconductors (Innovative talent 4.0) (Chonnam Nat. University)”
IITP(Institute of Information & Communications Technology Planning &Evaluation) (500 Million KRW/year)
Project manager
2022.5.1 ~2025.4.31
“Design of 3D DRAM Structure Using Virtual Simulation Platform to Improve Radiation Effect”
Samsung Electronics (66 Million KRW/year)
Project manager
2022.6.1 ~2025.2.28
“Integrated Semiconductor Development using Virtual Semiconductor Simulation Platform”
NRF (Ministry of Science and ICT) (57 Million KRW/year)
Project manager
Past projects
Period
Title
Funding
Role
2019.1.1 ~2021.12.31
“3-dimensional transistor structure & array-architecture design using statistical methodology”
Samsung Electronics (66 Million KRW/year)
Project manager
2018.3.1 ~2022.2.28
“Design of memory system for improvement of tail fault by probability distribution”
NRF (Ministry of Science and ICT) (75 Million KRW/year)
Project manager
2017.1.1 ~2020.12.31
“DC circuit breaker using optimized power semiconductor”
Korea Electric Power Corporation (80 Million KRW/year)
Project manager
2017.1.1 ~2018.12.31
“DC circuit breaker design using power semiconductor”
The Ministry of Science and ICT & INNOPOLIS Foundation. (83 Million KRW/year)
Project manager
2015.11.1 ~2018.10.31
“Development of margin expectation system using monte-carlo simulation & architecture design”
NRF (Ministry of Education) (50 Million KRW/year)
Project manager
2014.12.1 ~2016.11.31
“The invention of IGBT structure for improving reliability”
Korea Electric Power Corporation (80 Million KRW/year)
Project manager
2020.7.1 ~2021.6.30
“A study on the effective management of medical institutions using advanced AI technology"
NATIONAL HEALTH INSURANCE SERVICE (60 Million KRW/year)
Project manager