top of page
배너4.png

PROJECTS

Ongoing projects

Period

Title

Funding

Role

2022.7.1 ~2027.6.30

“Intelligent development of semiconductors (Innovative talent 4.0) (Chonnam Nat. University)”

IITP(Institute of Information & Communications Technology Planning &Evaluation) (500 Million KRW/year)

Project manager

2022.5.1 ~2025.4.31

“Design of 3D DRAM Structure Using Virtual Simulation Platform to Improve Radiation Effect”

Samsung Electronics (66 Million KRW/year)

Project manager

2022.6.1 ~2025.2.28

“Integrated Semiconductor Development using Virtual Semiconductor Simulation Platform”

NRF (Ministry of Science and ICT) (57 Million KRW/year)

Project manager

Past projects

Period

Title

Funding

Role

2019.1.1 ~2021.12.31

“3-dimensional transistor structure & array-architecture design using statistical methodology”

Samsung Electronics (66 Million KRW/year)

Project manager

2018.3.1 ~2022.2.28

“Design of memory system for improvement of tail fault by probability distribution”

NRF (Ministry of Science and ICT) (75 Million KRW/year)

Project manager

2017.1.1 ~2020.12.31

“DC circuit breaker using optimized power semiconductor”

Korea Electric Power Corporation (80 Million KRW/year)

Project manager

2017.1.1 ~2018.12.31

“DC circuit breaker design using power semiconductor”

The Ministry of Science and ICT & INNOPOLIS Foundation. (83 Million KRW/year)

Project manager

2015.11.1 ~2018.10.31

“Development of margin expectation system using monte-carlo simulation & architecture design”

NRF (Ministry of Education) (50 Million KRW/year)

Project manager

2014.12.1 ~2016.11.31

“The invention of IGBT structure for improving reliability”

Korea Electric Power Corporation (80 Million KRW/year)

Project manager

2020.7.1 ~2021.6.30

“A study on the effective management of medical institutions using advanced AI technology"

NATIONAL HEALTH INSURANCE SERVICE (60 Million KRW/year)

Project manager

bottom of page